only essential items remaining, it is time
to clean and paint. In some 5S programs, cleaning and
painting are considered separately. Either way, it is likely to be
done over time.
The
first cleaning leaves some dirt and oil. The next cleaning looks
better and third cleaning will prepare for painting. All floors,
equipment, and almost every surface should get paint.
Guidelines
for Shine
-
Each
work team should establish their own measure of "clean".
-
Establish
a regular schedule for routine cleaning and deep cleaning.
-
The
entire team participates. This is not something for a special
janitorial crew.
-
Ensure
that every crew has adequate cleaning supplies and equipment.
|